The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
The London and Southampton Railway was first proposed in 1831 and the bill approved by Parliament in 1834 at a cost of £900,000. The section between Basingstoke and Winchester opened on 11 May 1840 – and was the final part of the London and Southampton Railway to be completed. Prior to its construction, all of the traffic between London and Southampton was carried by eight stage coaches, four wagons per week, and one barge weekly on the Basingstoke Canal!
Micheldever Village Lunch
5 February 2025 at 12:30:00
Event details
Join us at 12:30 in Northbrook Hall.
The cost is £5.00 for a freshly prepared 2-course lunch, a glass of sherry or wine and coffee. It is a very sociable occasion where old friends meet and new friends are made.
Transport can be provided for those without their own vehicles or for the less mobile of attendees.
2025 Dates
5th February
March 5th
April 2nd
May 7th
June 4th
July 2nd
September 3rd
October 1st
November 5th
December 17th
Contact and Website details
Juliet Pattinson – (01962) 774399 Email – julietpattinson61@gmail.com
Anita Soar – (01962) 774133 Email – soar.anita@googlemail.com